Auto Parts

Dunlop Tyre Europe enters final phase of EUDR implementation

The tyre maker reports completed system integration and supply-chain due diligence statements ahead of the 30 December 2026 deadline.

Bianca RossiNovember 22, 20265 min read1 views

Stacked tyres in a warehouse while a worker scans a label with a tablet, with a rubber plantation visible through the window behind.

Dunlop Tyre Europe GmbH (DTE) has entered the final phase of its programme to implement the EU Deforestation Regulation (EUDR, Regulation (EU) 2023/1115). The Offenbach am Main, Germany-based tyre maker said the regulation, which requires deforestation-free supply chains with particular attention to the natural rubber used in tyre production, will apply to large and medium-sized companies from 30 December 2026.

DTE said the European Commission's simplification package of 4 May 2026 further clarified how the rules will be applied in practice. It reduces administrative effort when due diligence information is shared along the supply chain and sets clearer definitions of roles and responsibilities as well as of digital verification procedures. Transparency, traceability and a robust data foundation remain central to the regulation, and the company treats the clarification as confirmation of its chosen implementation approach.

Progress along the supply chain

EUDR processes have been established from import and goods receipt through warehousing to shipment and export. Integration between SAP, the EU information system TRACES and the logistics and barcode systems is complete, and a validation step at goods receipt serves as a key control mechanism.

Process, data and interface testing across the entire supply chain has been completed successfully, according to the company. Due Diligence Statements (DDS) can now be issued and passed along the supply chain, allowing DTE to demonstrate compliance both as an importer and as a downstream operator while drawing on information already validated by upstream partners.

Until 30 December 2026 the company will focus on further improving data quality, increasing the automation of verification processes, preparing for audits and extending digital connectivity for customers, including via EDI-Wheel. After the go-live date, the project is to move into regular business operations.